On and on and on…

The smallest of the 3 rooms in the basment is about as big as a prison cell. The closet takes up an entire wall. That’s the closet, to the left.

paintbasement1.jpg

It’s the only thing that’s primed.

paintbasement2.jpg

The room opposite this one is about twice as big with a closet about half the size of this one.

The big rec/livingroom on the other side is about a gazillion times bigger.

If I can paint an hour every day like I did today, the basment will be primed sometime by Xmas time. And painted, with a floor in, sometime by Xmas time 2009.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s